What we'll be doing

A tunnel boring machine
The cutting wheel at the front of the tunnelling machine minimises disturbance above ground.

Our new treatment works and sludge recycling centre, at Lower Hoddern Farm, Peacehaven, will fully treat for the first time 95 million litres of wastewater generated each day by the residents of Peacehaven, Telscombe, Saltdean, Rottingdean and Woodingdean along with Brighton and Hove. We will be constructing an 11km underground pipeline to take the wastewater to the new treatment works.

 

 