Water and wastewater services for Kent, Sussex, Hampshire and the Isle of Wight
Your area

Find out if you're a Southern Water customer, check your water quality, or explore our interactive map to see what's going on in your area

You are here: At home » Your area » Improvements near you » Sussex

Your area

Find out if Southern Water supplies your home, check your water quality or explore what's happening in your area.
 

Need help?

Type your question into the box below or see what other customers often ask.

Chichester Pipeline

We're planning to build a 10km sewer pipeline that will run from the west of Chichester, across the north of the city and through to Tangmere, where it will connect to our Tangmere Wastewater Treatment Works. 

What are you doing?

We’re in the process of requesting planning permission for a new 10km sewer pipeline and upgrade and expansion of our existing sewer network. This will include three new pumping stations to take away and treat wastewater from proposed new homes, identified in Chichester District Council’s Local Plan. Our application will be submitted to West Sussex County Council in late November.

What do your plans involve?

In our current plans, the first pumping station will be at the start of the pipeline. A second will be built close to Madgwick Lane and the third in Tangmere, to the West of Tangmere Military Avitation Museum. The pumping stations will be largely below ground – all that will be visible above ground will be green kiosks and a treatment unit.

How we’ll build the pipe

The pipeline will be a maximum 315mm in diameter – roughly the same as a dinner plate. In some environmentally sensitive sections, we’ll be using directional drilling via small pits from which we can create tunnels to insert pipework, causing less disruption at ground level. Where this isn’t possible and we need to cut into the ground we’ll be reinstating it back to its original condition. The majority of the trench work will be in fields. Around 17 areas along the route will be used to store equipment for the works – again, we hope these will cause minimum disruption.


What impact will the project have on our area?

Protecting the environment and ecology is a priority for us and we must work within strict parameters.We’ve carried out a detailed Environmental Impact Assessment, working closely with local authorities, as well as organisations such as Natural England, the Environment Agency, Sussex Wildlife Trust and Highways England. Our work has included surveys to look for badgers, reptiles, bats and birds, among others. Working in the community, we’ll do all we can to limit disruption. We’ll always tell you before we start work in your area and will have dedicated customer liaison teams on hand.

What about any archaeological finds?

We’ve been working with a team from Archaeology South-East which unearthed some important relics, dating back as far as 1500BC. Among the most significant finds were:

  • A previously-unknown section of the Iron Age Chichester Entrenchments and wooden posts suggesting timber buildings
  • A finely-made pottery bowl and clay spindle whorl used in the preparation of textiles
  • Large quantities of pottery dating from around 200 to 300AD


These discoveries should provide a greater understanding of the ancient history of Chichester.

When will the work take place?

We hope to start in summer 2018, completing construction within 18 months, and reinstatement of all areas within two years. We intend to start at the eastern end working westwards from Tangmere. We’ll be able to share a finalised construction programme once we’ve secured planning permission.

Exhibition

First, we need planning permission for the project and we’re aiming to submit our application to West Sussex County Council in late November.

We’d like to share our current plans with you, so we can get your feedback before submitting our application. We'll be holding an exhibition at Assembly Hall, Chichester Council House, North Street, PO19 1LQ:

  • Fri September 15 – 2pm-7pm
  • Sat September 16 – 10am-12.30pm

We'll then be holding another exhibition on November 8 to share our final plans on and aim to submit our planning application in late November.

More information is available in our scheme leaflet:


We'd appreciate your feedback on our plans: https://www.surveymonkey.co.uk/r/chichesterpipeline 

If you have any questions, please email capitalcomms@southernwater.co.uk

 
 
 
  Close box