If your site doesn’t have easy access to our wastewater network, you can apply for a sewer requisition (Section 98) through us. Here you can find out about the application process for a new sewer.

background

When do I need to apply for a sewer requisition?

Not all developments have access to our public sewers and sometimes you may need to cross private land to reach one or build your own. In this situation, you can ask us to install a new sewer pipe so that you can connect your properties to our wastewater network. We’ll design the best route, agree the details with you, and build the new sewer so your development can connect to our network. 

Apply for a sewer requisition

Below you can find several guides and application forms — please read them before you get started. We'll be in touch every step of the way to make sure everything runs smoothly. Before you apply you'll need: 

  • details of drainage easements over adjacent land or with neighbouring property owners
  • an on-site drainage plan to show the suggested sewer requisition route and connection point. Roads, adjacent buildings and the private pipe to our network should be clearly shown
  • a site location plan (1:1250 scale preferred) with the development to be drained outlined in green 
  • proposed and existing site layouts. These should include easements, pipe distances, any buildings being demolished. 
  • to confirm if your sewer connection will be pumped. If so, please state the company designing and constructing your pumping station and the pump rate.  
1

Apply online

Once we’ve received your application through our GetConnected Portal, we’ll review it and get back to you within five working days to let you know if we need more information. 

Apply now
2

We’ll provide a quote

We’ll review the possible route, create a feasibility design and provide you with a budget estimate — a rough cost — within 12 weeks. 

3

Accept and pay the design fee

Once you’re happy with the estimate, accept the offer and pay the design fee. We’ll then assign a Project Manager as your main point of contact. 

4

Design

Our team will complete the design and send you a Sewer Requisition (S98) Agreement, which includes construction costs. 

5

Sign the agreement and pay

Sign the Sewer Requisition Agreement and return it to us with payment for the construction fee. 

6

Build and connect

We'll schedule the works and confirm a start date on site. Our Engineering team will build the sewer and connect it to our network. 

7

Cost of works check

Once the work is complete, we’ll compare the actual cost with the original estimate. If there’s a difference, we’ll either refund you or request an additional payment. 

8

Apply for a sewer connection (if needed)

When your sewer requisition is complete, you can apply for a sewer connection (Section 106) for any other drainage needs not covered by the requisition. 

Sewer Connection

Useful guides and documents

Below you'll find specific documents and guidance to help you through the application process.